
Bathtub replacement with a shower tray on the Costa del Sol
We replace bathtubs with flush-to-floor shower trays, with new tiling, a shower screen and taps, addressing drainage and waterproofing.
What we offer
It is one of the most requested jobs: improve accessibility and gain space without renovating the entire bathroom.
- Removal of the existing bathtub
- Flush-to-floor shower tray
- Tiling of the shower area
- Made-to-measure glass shower screen
- Concealed or exposed taps
- Adaptation of drainage and waterproofing
What the service includes
- Removal of bathtub and taps
- Adaptation of drainage
- Waterproofing of the wet area
- Tray installation and tiling
- Installation of shower screen and taps
- Sealing and final cleaning
How we work
- 01
Site visit
We measure the space and check the existing drainage.
- 02
Removal
We remove the bathtub and affected tiling with the area protected.
- 03
Installation
We adapt drainage and water connections.
- 04
Waterproofing
We seal the wet area before installing the tray.
- 05
Finishing
We tile, install the shower screen and taps and seal.
Materials and finishes
We choose the tray, shower screen and taps based on daily use and ease of cleaning.
Advantages of working with BAF
- A more accessible bathroom that is easier to clean
- Work completed within a few days
- Correct waterproofing beneath the tray
- Finishes that match the existing bathroom
Service on the Costa del Sol
We replace bathtubs with shower trays in Benalmádena, Torremolinos, Fuengirola, Mijas, Marbella, Estepona and Málaga.
We are based in Arroyo de la Miel, Benalmádena, which allows us to serve municipalities along the coast and inland in the province of Málaga promptly.
Frequently asked questions about shower trays
How many days does the replacement take?
It is usually completed in a few days of work, depending on the tiling and materials chosen.
Does all the tiling need to be replaced?
Not necessarily. Only the affected area can be tiled, using a compatible tile.
Will the tray be flush with the floor?
Yes, provided the drainage and structural floor slab allow it; we check this during the site visit.
Does it include the shower screen?
Yes, we can include a made-to-measure shower screen and new taps in the same quote.
Related services
Request a quote
Tell us about your shower trays project: what you need, where the property is located and when you would like to start. We respond directly.


